Pre-Feasibility Study focusing on the closure of the original tailings storage facility complex. A number of options for closure were considered and the adopted design considered unique closure solutions such as incorporating sand tailings within the design, resulting in reduced capital costs not only associated with the 567 dam’s complex, but also set a benchmark for future dam closures resulting in a reduced requirement for future sand tailings storage facilities.